News
» Go to news mainIMPORTANT PARKING LOT CLOSURE
If you park in the Rosina lot on Sexton campus please note that paving will take place from Tuesday, August 1 until Saturday, August 5.
The paving will be done in two phases so that half the parking lot will still be available. The half closest to Morris Street will be done first. We apologize for the disruption, but expect there will be more available spaces at the end of the project when the lines are painted to maximize the space.
听
FURTHER CONSTRUCTION ANNOUCEMENTS
Also note that effective Monday, 29 July 2017,听the East side door (the one facing the quad that goes to alumni lounge) of D building will be closed to normal traffic. 听The closure is due to safety concerns.听
This door will remain useable as an EMERGENCY EXIT ONLY. 听People wishing to exit may do so via the North door of D (onto the roadway), or via N building.
The closure is expected to remain in effect until 2 September 2017.
Thank you for your understanding.听
Recent News
- Incoming Schulich Leader aims to improve lives through innovation
- Door鈥慽n鈥慏oor鈥憃ut: Noreen Kamal brings an engineer鈥檚 eye to stroke treatment
- Why I Do It
- 9 1免费版下 Student Leads the Way on Planning for 2026 Atlantic Engineering Competition
- 9 1免费版下 Rocketry Team Soars to New Heights
- Welcoming the Next Generation of Engineers
- 9 1免费版下 Golf Tournament Drives Student Innovations
- 2025 Engineering Golf Tournament